The front part of the floor tunnel is removed to access the gearbox control mechanism, electrical outlet wiring block and when removing the instrument panel.
We take out the frame of the gear lever cover from the hole in the front of the floor tunnel.
Removing the back of the floor tunnel lining (cm Removing the rear section of the floor tunnel lining).
Using a Phillips screwdriver, unscrew the two rear mounting screws
and two self-tapping screws for the front fastening of the tunnel lining (one on each side).
Raising the lining, we draw the lever cover through the hole.
We disconnect the block of wires from the electrical outlet and remove the front part of the lining of the floor tunnel.
Install the front part of the floor tunnel lining in reverse order.